FRIDAY LETTER APRIL 9,2021

FRIDAY LETTER APRIL 9,2021

Sandy shores well project.

The Sandy Shores well project is winding down most of the equipment is gone and the site is cleaned up and looking good. Monday we will be putting the media into the filter assemblies and sanitizing them, we are waiting for a date from P.S.E to switch the power from the old building to the new one we should have a date early next week. Pacific Crest Construction has done a great job building our new facility it is top notch.

Springs.

It is also highly effective to locate your different organs and as the Taoists would do viagra prescription just smile at them. It helps to deal with heart problems and the nervous system. pills viagra canada Buying lowest priced cialis saves you money when treating sexual dysfunction. order viagra online http://secretworldchronicle.com/tag/red-djinni/ Consumption of pre-cooked and fast foods, drinking sweet drinks, and little natural or organic healthy food intake can also affect.

Next week I will be spending more time down at the springs doing a wide spread well point maintenance (Getting all the well points flowing there max at the same time) in preparation for spring planting. Right know the springs are at 75 G.P.M when all the well points are brought up to speed at the same time we get about 85G.P.M on average.

have a great weekend.